Monday, 7 September 2026 MUMBAI EDITION LIVE

Gaimukh-Payegaon Creek Bridge Nears Completion

Thane's mobility network takes shape with 95% piling work done. Bridge to ease traffic on Ghodbunder Road.

Mumbai Alert · City Desk
Mumbai Alert · City Desk
City Desk · Mumbai Alert News · Sun, 06 September 2026 at 11:52 pm
Gaimukh-Payegaon Creek Bridge Nears Completion

The construction of the Gaimukh–Payegaon Creek Bridge has reached a significant milestone, with piling work for the creek section crossing 95% completion. The bridge is a key component of the Mumbai Metropolitan Region Development Authority’s (MMRDA) plans to strengthen Thane’s regional connectivity.

The project has completed nearly 25% of the 6.5-km stretch, with foundation work nearing completion. Construction of piers and pier caps is progressing rapidly, and work is also underway at both ends of the bridge at Gaimukh and Payegaon.

The bridge is planned to provide a direct link between Gaimukh on Ghodbunder Road and Chinchoti-Payegaon, improving connectivity towards Bhiwandi, Vasai, and other northern parts of the Mumbai Metropolitan Region (MMR). This will ease pressure on Ghodbunder Road, one of Thane’s busiest corridors that carries traffic towards Mumbai’s western suburbs, Mira-Bhayandar, and the Mumbai–Ahmedabad Highway.

Currently, motorists heading towards Chinchoti, Payegaon, and Vasai have to negotiate the ghat section at Ghodbunder, where traffic is frequently affected by heavy vehicles. Once operational, the creek bridge will bypass this ghat stretch and provide a more direct route for both passenger and freight traffic.

The bridge will also provide connectivity to several major infrastructure projects, including the Mumbai–Ahmedabad High Speed Rail corridor, Thane Coastal Road, Virar–Alibaug Multimodal Corridor, Diva–Vasai railway line, National Highway 48, and the Anjur–Chinchoti Road.

The Gaimukh–Payegaon bridge is being developed as part of MMRDA’s broader multimodal mobility strategy, which seeks to integrate road, metro, tunnel, and other transport infrastructure to improve regional connectivity. This strategy aims to strengthen the movement of goods and people between Thane and the northern and western parts of the MMR.

The completion of the bridge is expected to improve travel efficiency and reduce traffic congestion on Ghodbunder Road. It will also provide a boost to the local economy by facilitating the movement of goods and people.

In the broader context, the Gaimukh–Payegaon Creek Bridge is part of a larger effort to improve regional connectivity in the Mumbai Metropolitan Region. The MMRDA has been working to develop a comprehensive transportation network that includes roads, metro lines, and other infrastructure projects.

The significance of this project cannot be overstated, as it will have a major impact on the lives of commuters and residents in Thane and surrounding areas. With the bridge nearing completion, residents can look forward to reduced traffic congestion and improved connectivity to other parts of the region.

In conclusion, the Gaimukh–Payegaon Creek Bridge is a critical infrastructure project that will play a major role in shaping the mobility network of Thane and the surrounding regions. Its completion will have a significant impact on the local economy and the lives of residents, and it is a testament to the MMRDA’s commitment to improving regional connectivity.

Frequently asked questions

What is the purpose of the Gaimukh-Payegaon Creek Bridge?

The bridge is planned to provide a direct link between Gaimukh on Ghodbunder Road and Chinchoti-Payegaon, improving connectivity towards Bhiwandi, Vasai, and other northern parts of the Mumbai Metropolitan Region (MMR).

How will the bridge affect traffic on Ghodbunder Road?

The bridge will bypass the ghat stretch on Ghodbunder Road, providing a more direct route for both passenger and freight traffic and easing pressure on one of Thane’s busiest corridors.

thanegaimukh-payegaon creek bridgemmrdaghodbunder road
X Facebook Telegram
Read the original report ↗

More in Mumbai

Mumbai

Bombay HC Upholds ₹115.65-Crore Mithi River Project Suit

Bombay HC refuses to dismiss suit, allows correction of procedural error. Mithi River project dispute to continue.

By Mumbai Alert · City Desk · 1 hr ago

Mumbai

Mumbai Student Loses Rs 24.6 Lakh in Scam

A Mumbai student has been duped of Rs 24.6 lakh. A police complaint has been filed.

By Mumbai Alert · City Desk · 2 hr ago

Mumbai

Mumbai Fires: 4 Injured in Dharavi, Blaze Erupts at Lamington Road

Four injured in Dharavi fire, massive blaze at Lamington Road godown

By Mumbai Alert · City Desk · 2 hr ago

Mumbai

Vasai-Virar Smart Meter Protest Postponed

Vasai-Virar protest against smart meters postponed, march to MSEDCL office scheduled

By Mumbai Alert · City Desk · 2 hr ago